Latest Projects

  • Large Central Tank Battery Midland Basin (CTB)

    EPCm delivery for a large upstream oil & gas central tank battery facility, supporting a 30-well development with four remote pads. Project completed January 2025.
  • Tankless Battery Delaware Basin

    EPCm delivery for a fully electric upstream oil & gas tankless production facility, supporting a five-well development. Project completed September 2024.
  • 2023 Central Tank Battery (CTB) Facility

    EPCm delivery for an upstream oil & gas production facility, including a nine-well development with three remote well pads.
  • 2022 Central Tank Battery (CTB) Facility

    EPCm delivery for an upstream oil & gas production facility, utilizing a grooved piping system and supporting a three-well development.
  • 2022 Remote Wellsite Facility

    EPCm delivery for an upstream oil & gas five-well production facility, designed to flow production to an existing 20+ well Central Processing Facility (CPF).
  • 2022 6″ Two Mile Crude Pipeline

    EPCm delivery for a 6-inch crude oil gathering pipeline, including launcher and receiver stations, designed for 1,440 psi service. Engineering and job book documentation successfully passed […]
  • 2021 Major Saltwater Disposal (SWD) Expansion

    EPCm delivery for an upstream oil & gas salt water disposal (SWD) facility upgrade, including removal and replacement of H-pumps, filtration systems, and associated piping.
  • 2020 Saltwater Disposal (SWD) Facility

    EPCm delivery for an upstream oil & gas salt water disposal (SWD) facility with 30,000 barrels per day capacity.